top of page

Ongoing Projects

PAMANGA-DAKKA ROAD, BALI L.G.A, TARABA STATE

DATE OF AWARD: JULY 2021

PROJECT DESCRIPTION: The project essentially entails the CONSTRUCTION OF PAMANGA – DAKKA ROAD. The road network comprises of a single carriageway of 12.8m width and approximately 35.9Km length, along the existing road alignment.

 

It shall be made up of 200mm lateritic sub-base, 150mm stone base on the carriageway and 40mm asphaltic concrete wearing course.

 

There shall also be an extensive construction of lined drains and culverts of various shapes and sizes.

p1.png
p2.png
geldconstructionTaraba7.png
ppp1.png
geldconstructionTaraba13.png
geldconstructionTaraba5.png
pp10.png
boxCulvert-workInProgress2.png
pp9.png

Reconstruction of existing pavement and completion of the additional pavement on the dualisation of Abuja-Lokoja highway, section iii (Ch.82+000 – 131+362): Abaji-Koton Karfe road in Kogi state.

DATE OF AWARD: March, 2022

Description of Work:

The road is a major connector from the Federal Capital Territory to the North Central state of Kogi and the Southern part of the country. The length of the reconstruction is about 49.362km, of the dualized road.

The works include the Reconstruction of a 49km single carriageway of 11.85m width.

It shall be made up of, 150 mm regulation stone base as sub-base, 200 mm crushed stone base, 60mm asphaltic concrete binder course, 60mm MB asphaltic concrete binder course, and 40mm MB asphaltic concrete wearing course.

This also includes the construction of side drains and box culverts as required.

Aji09.jpg
Aji10.jpg
Aji25.jpg
Aji23.jpg
Aji22.jpg
Aji20.jpg

Construction of Abiola-Onijemo Link Road with Bridge in Ifako Ijaiye Local Government Area, Lagos State.

DATE OF AWARD: May, 2022

Description of Work:

Construction of a 650m length, road connecting 6 adjoining roads. This project consists of 210m bridge,
earthworks, 200mm crushed stone base, asphaltic binder and wearing course and hydraulic structures -
box culverts, u-covered drains and other erosion control works.

C205_1.jpg
C205_2.jpg
20230406_151634.jpg
IMG-20240318-WA0000.jpg
DJI_0135-3.jpg
DJI_0150-10.jpg
DJI_0046-39.jpg
DJI_0888-23.jpg
A-1.jpg

Reconstruction of Ikorodu-Itoikin Road (Sabo Roundabout to Itoikin Market), Ch.0+000-Ch.34+000 in Lagos State.

DATE OF AWARD: November, 2022

Description of Work:

Reconstruction of the 34km existing road (single carriageway), 6.5 m and 1.8 m carriageway, and shoulder widths respectively to the standard 7.3m carriageway and 2.75m shoulder width.

 

The Reconstruction involves the following works: earthworks, Concrete-lined Drains, Pipe and Box Culvert, Slope Protection, and Bridge Repairs.

 

The road structure will comprise a 200mm Sub-base, 200mm Crushed Stone Base, 2 layers of 60 mm Asphalt Binder Course, and a 40 mm Asphaltic Wearing Course.

DJI_0197-100.jpg
DJI_0178-76.jpg
IMG_3191-93.jpg
IMG_4399.JPG
IMG_4648.JPG
IMG_4662.JPG

Construction of the New Government House at Shonpa-Kona in Jalingo, Taraba State

DATE OF AWARD: January, 2023

Description of Work:

The project involves the construction of

  1. 1.5 km access road and all other auxiliary facilities into the New Government

  2. Main entrance gatehouse with its other associated facilities, and

  3. 7.4 km perimeter fence with its supporting components

 

The works cover Gate House and Fence, Access, Site Clearance and Earthworks, Culvert, and Drains, Pavement and Surfacing,

Reconstruction of Benin – Sapele – Warri Road [Section II: Imasabor – Ibada Elume, km 28+275 – km 66+800 (38.525 km)]

Date of Award: 3rd May 2023

Description of Work:

The road is a 38.525 km dual carriageway. We aim to reconstruct the deteriorated carriageway. The roadway will include a pavement of 7.3 m width and shoulders of 1.8 m and 2.75 m internal and external width.

 

The scope of work involves earthworks, concrete-lined drains, subsoil drains, pipe and box culverts, asphaltic concrete pavement, slope protection and bridge repairs.

 

The road structure will comprise a 200 mm sub-base, 200 mm crushed stone base, 2 layers of 60 mm asphaltic concrete binder course and 40 mm asphaltic concrete wearing course.

DJI_0918-16.jpg
DJI_0924-18.jpg
IMG_0222.JPG
IMG-20240810-WA0040.jpg

Rehabilitation/Upgrading of Ilabere, Ilu and Inupa Roads in Ikoyi, Eti-Osa, Local Government Area, Lagos State.

Date of Award: 10th May 2023

Description of Work:

This project entails the reconstruction and upgrading of the existing 1600 m asphalt single carriageway to an interlocking pavement.

 

The scope of work involves site clearance, relocation of electrical and water services, earthworks, box culverts and u-covered drains, interlocking pavement, lane marking and installation of streetlights

DJI_0379-61.jpg
DJI_0336-33.jpg
002.jpg
4L.jpg
1L.jpg

Construction of Amansea - Ifite Road - Aroma - Overpass - Ekwueme - Government House Road

 

Date of Award: 5th September 2023

Description of Work:

This project entails the construction of a 14.7km carriageway and 300m flyover.

The scope of work involves earthworks, construction of new culverts and drains, slope protection on embankments, 200mm crushed stone base, 50mm asphaltic concrete wearing course, and bridge works.

20231115_150525.jpg
20231115_095744.jpg
IMG_5215.JPG
IMG_0593.JPG
IMG_7365.JPG

Rehabilitation of Nnobi - Nkpo Road in Anambra State

Date of Award: 27th November 2023

Description of Work:

The contract works consist of the rehabilitation of an 18.5km carriageway.

The scope of work involves earthworks, construction of culverts and drains, 200mm crushed stone base, 50mm asphaltic concrete wearing course, surface dressing on shoulders and road marking.

20240302_143412.jpg
20240302_135956.jpg
IMG_6118.JPG
IMG_6236.JPG

Construction of Amuvi-Ndi Okereke – Ozu Abam Road in Abia State

 

 

Date of Award: 28th November 2023

Description of Work:

The project involves the construction of an asphaltic concrete road of 30.5 km length.

The scope of work includes earthworks, construction of box & pipe culverts and drains, slope protection, 200mm crushed stone base, 60mm asphaltic concrete binder course, 40mm asphaltic concrete wearing course, filters at areas of high-water table and road marking.

IMG_0143.JPG
IMG_0172.JPG
IMG_8329-42.jpg
IMG_8425-104.jpg
IMG_8313-31.jpg

Dualization and Reconstruction of Amawbia – Uga – Orlu Boundary Road Anambra State

Date of Award: 6th May 2024

Description of Work:

The contract works consist of the reconstruction and dualization of a 16.075km asphaltic concrete road.

 

The scope of work involves earthworks, culverts and lined drains, crushed stone base, asphaltic concrete wearing course, green areas, road marking and toll gates.

IMG-20240727-WA0005.jpg
IMG-20240727-WA0003.jpg
IMG-20240727-WA0004.jpg
bottom of page